亚洲精品沙发午睡系列,麻花传剧mv在线看星空,日本一丰满一bbw,2021亚洲va在线va天堂va国产

The universal grinder set of standard operating procedures and equipment structure
The universal grinder group is mainly composed of several major components of the base, casing, spindle activity tray, sieve, hopper, active plate fixed on the spindle, fixed plate mounted on the front cover, active disk follow the spindle motor start together for High-speed rotary motion.
¡¡¡¡The universal grinder group on the upper end, the next two hoppers, material added to the hopper, open baffle on the bottom of the hopper, the material from under the hopper through the middle hole of the fixed disk enter the shredder cavity. Because the relative operation of the high speed of the movable disk and a fixed disk, while the ring gear of stars layers staggered so that the material to be crushed in their relative movement. The crushed material through the machine sieve filtered through the fine sieve, the outflow from the export base, rough and some continue to stay in the machine chamber crushed, so the cycle to complete the crushing of materials processing.
¡¡¡¡Universal grinder set of standard operating procedures
¡¡¡¡(1) universal mill group before the operation prepared:
¡¡¡¡Various components (1) check universal grinder group is firmly installed, especially activities teeth fixed nut, tighten the screws;
¡¡¡¡(2) check the universal grinder group equipment clean condition;
¡¡¡¡¢Û check the the universal grinder group of equipment lubrication;
¡¡¡¡¢Ü Check whether upper and lower pulley in the same plane parallel to the belt tension situation
¡¡¡¡¢Ý turned by hand when jamming phenomenon, spindle running freely
¡¡¡¡¢Þ crushed material necessary to pre-cut into segments, slices or blocks, to avoid blocking the steel teeth, increase the motor load
¡¡¡¡¢ß check materials. Note the clear material in metallic foreign body such as nails, prevent accidents
¡¡¡¡(2) universal mill group run
¡¡¡¡¢Ù Open the collection box door, in a bar on the dedicated bag spout. Close the collection box door
¡¡¡¡¢Ú According to the technological requirements of the universal mill group selection screen, install screen
¡¡¡¡¢Û Check whether the material to be crushed pretreatment
¡¡¡¡¢Ü first open the universal mill group fan switch, motor switch to open the normal equipment load running, add materials, adjust the feed rate according to the degree of friability of the material and the grinding fineness requirements? ¢Ý smash the end of the operation, or you want to stop, before stop feeding. Universal mill group to continue to operate for a few minutes until the grinding chamber no residue.
¡¡¡¡¢Þ discharge: Turn off the motor switch, open the collection box door, remove the material stand
¡¡¡¡¢ß such as the large amount of crushed material can repeat the operation, legislation to all materials crushed
¡¡¡¡¢à universal grinder group operation is finished, turn off all power switches
¡¡¡¡¢á check whether the abnormal equipment of universal mill group. Parts of the equipment in good condition
Related News:
¡¤ Innovation, energy saving, environmental protectio  
¡¤ Vacuum dryer product performance characteristics a  
¡¤ Vacuum dryer used for inspection and debugging wor  
¡¤ Difficulties and reasons cannot start mixing machi  
¡¤ The correct operation method using vacuum dryer  
¡¤ Development advantages and characteristics of dome  
¡¤ The difference between the special vacuum dryer an  
¡¤ Detailed description of each component characteris  
¡¤ The dominant position in the whole vacuum dryer dr  
¡¤ Trough type mixer sometimes appear large area leak  
Related Products:
¡¤ PGL Spray Drying Granulator
¡¤ High speed mixer
¡¤ SET series double screw extrusion pelletizer
¡¤ VI forced mixer
¡¤ Mixing machine W series
¡¤ Powder machine ZSJ series vibrating screen
¡¤ FZ series of crushing granulator
¡¤ Chinese medicine grinder
¡¤ DWT series of drier for dehydrated vegetables
¡¤ Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519£­88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

¼«Æ·ÉÙ¸¾±»Ã͵ð׽¬Ö±Á÷²ÝÝ®ÊÓƵ| ÎÞÂëÈËÆÞ¾«Æ·Ò»Çø¶þÇøÈýÇø99²»¿¨ | СѩºÃ½ôºÃ»¬ºÃʪºÃˬÊÓƵ| ÎçÒ¹³ÉÈËÎÞÂ븣ÀûÃâ·ÑÊÓƵ| ¶¡ÏãÉ«Óû¾Ã¾Ã¾Ã¾Ã¾Ã×ÛºÏÍø| ¹ú²úÑÇÖÞavÊÖ»úÔÚÏß¹Û¿´| Ãâ·ÑҹɫÎÛ˽ÈËÓ°ÔºÔÚÏß¹Û¿´| ¾Ã¾Ã¾«Æ·¹ú²úÑÇÖÞavÂ鶹ɫÓû| ¾«Æ·¹ú²úa¡ÅÎÞÂëÒ»Çø¶þÇøÈýÇø| ÀÏʪ»úÏ㽶¾Ã¾Ã¾Ã¾Ã¾Ã| ¾«Æ·ÑÇÖÞ¹ú²ú³ÉÈË| ÑÇÖÞ¾«Æ·¾Ã¾Ã¾Ã¾Ã¾Ã¾Ã¾Ã¾Ã¾ÃÀ¦°ó| Ãâ·Ñ¹Û¿´ÐßÐßÊÓƵÍøÕ¾| Ë«Èé±»Ò»×óÒ»ÓÒ³Ô×Ŷ¯Ì¬Í¼| ÈÕº«Ò¹Ò¹¸ß³±Ò¹Ò¹Ë¬ÎÞÂë| Å·ÖÞÊ츾¾«Æ·ÊÓƵ| Ãâ·Ñ¿´ÄÐÅ®×öÐßÐßµÄÊÂÍøÕ¾| ÉÙ¸¾ÓäÇéÀíÂ×Ƭ| ÈÕº«²»¿¨ÊÖ»úÊÓƵÔÚÏß¹Û¿´| ¹ú²ú¾«Æ·ÈÕ±¾ÑÇÖÞ777| ÑÇÖÞav¾«Æ·Ò»Çø¶þÇøÈýÇø| È˳ÉÎçÒ¹´óƬÃâ·ÑÊÓƵ77777| ¹ú²ú¾«Æ·¾Ã¾Ã¾Ã¾ÃÈ龫Ʒ±¬| ¾«Æ·ÎÞÂë¾Ã¾Ã¾Ã¾Ã¾Ã¹ú²ú| É«æÃæûùµØ| ¾Ã¾Ã¹ú²ú¾«Æ·Ãâ·ÑÒ»Çø¶þÇøÈýÇø | ÑÇÖÞÈ˳ɵçÓ°ÔÚÏß¹Û¿´ÌìÌÃÉ«| ÒÁÈ˽¶¾ÃÖÐÎÄ×ÖÄ»ÎÞÂëרÇø| ¾Ã¾Ã¾«Æ·¹ú²úÑÇÖÞavÂ鶹| Ç¿¿ªÐ¡æÃÄÛ°úÓÖÄÛÓÖ½ôÊÓƵ| ÈÕº« ÎÞÂë ͵ÅÄ ÖÐÎÄ×ÖÄ»| ÖÐÎÄ×ÖÄ»ÔÚÏß²¥·Å| ¼¤Çé͵ÂÒÈËÂ×С˵ÊÓƵÔÚÏß | ¹ú²ú³ÉÈËavÒ»Çø¶þÇøÈýÇø²»¿¨| ÈȾþùú²úÅ·ÃÀÒ»Çø¶þÇø¾«Æ· | Ãâ·ÑÎÞÂë¸ß³±Á÷°×½¬ÊÓƵ| ¾Ã¾Ã¾«Æ·ÕâÀïÈÈÓо«Æ·| ¹ú²úÃâ·ÑˬˬÊÓƵÔÚÏß¹Û¿´| Ò°ÍâÐÔÊ·Å·ÃÀk8²¥·Å| ¹ú²úÅ·ÃÀ³ÉÈËÒ»Çø¶þÇøaƬ| ÈÕ±¾sm/ÐßÈè/µ÷½Ì/À¦°óÊÓƵ|