亚洲精品沙发午睡系列,麻花传剧mv在线看星空,日本一丰满一bbw,2021亚洲va在线va天堂va国产

The universal grinder use regulations and swing particles machine maintenance
Universal grinder use regulations
  Universal grinder are hopper bucket outside of the following feed regulation flapper should adjust the flapper to the blanking size, according to the degree of friability of the material and the grinding fineness, indeed when the position and tighten .
  The universal grinder beneath the discharge port, if the discharge of the amount of material wind caused slightly spray material phenomenon, should be in a material bag plus port bundling material by Higuchi bag slowly spillover.
  Should be carried out before the first boot once empty running test, commissioning should be preceded by checking the universal grinder sites to confirm whether the universal grinder qualified.
  Universal grinder has a water-cooled, plus use should be used to avoid damage to the bearings.
  The universal grinder installation and debugging
  1. Fixed-gear Imperial the Imperial went bolts can.
  2 fold the Royal universal grinder bearings, first open cavity, the Royal derotation chainring or rotary knife, take away the maze and the center bearing cap, then Imperial to the outer end of the pulley and bearing cap, which launched both ends of the axial Imperial go to both ends of the bearing and shaft.
  Installation still keep the alignment of the the shaft cavity bush hole oil eye.
  Install universal grinder screen sieve circle close to the machine cavity shoulder tank, otherwise damage sieve circle when the door is closed.
  5. Making universal grinder sieve ring, mesh expand the length should be the root noted in the sieve circle shoulder sized screen damage manufacturers should be equipped to do.
  Install universal grinder screen: the two sieve Circle merged alignment mark and then sieve into within the sieve circle, such as the mesh too tight, then push out the screen inward curved into can.
  Rock particles maintenance methods:
  (1) Swing particle the machine lubrication: lubrication cycle refueling time: ① general parts per run three days; ② The Rolling 1 # calcium based grease every 3 months.
  (2) rock particles maintenance
  1) maintenance cycle: (1) motor: checked once a month; ② each class using the time of the rock particles the machine overall seized enterprises.
  2) maintenance of content:
  (1) periodically check the reliability of the insulation resistance of the rock particles machine electrical system components and the control loop and then zero, to ensure the safe use of electricity;
 、 check swing particles machine parts on a regular basis (monthly - the times), check whether the active portion of the worm, worm, bearings and other rotating flexible and wear, discovered defects should be repaired in time, may not continue to use;
 、 the transmission part of the rock particles should all drive, refueling time, add the midway may be part of the operation;
 、 worm gear box to be long-term storage of oil, the oil surface height worm gear fully immersed in oil, the continuous use of the aircraft, the required oil change every three months;
  ⑤ before rocking operation of the pellet machine idling confirm normal run, well-oiled, before normal operation;
  When you and ⑥ swing particles machine after use or lockout time, you should remove the rotating drum cleaning brush cleared the remaining flour sub in the bucket, and then properly installed, ready to work for the next;
  (7) if a longer time to discontinuation must swing the particle machine clean.
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

欧美猛少妇色xxxxx| 国内精品久久久久久久影视麻豆| 97久久久久人妻精品专区| 亚洲av成人一区二区三区在线观看| 国产一区二区三区乱码| 少妇夜夜春夜夜爽试看视频| 亚洲av乱码久久精品蜜桃| 国产suv精品一区二区33| 亚洲色欲色欲www在线观看| 在线精品国产成人综合| 亚洲成熟丰满熟妇高潮xxxxx| 精品+无码+在线观看| 国产在线无码制服丝袜无码| 中文在线а√在线| 国产精品天天狠天天看| 少妇无码av无码专区线| 日本一区二区在线播放| 欧美激情综合色综合啪啪五月| 内射干少妇亚洲69xxx| 天天鲁在视频在线观看| 精品国产乱码久久久久软件 | 老师脱了内裤让我进去 | 最新欧美精品一区二区三区| 一本一道av无码中文字幕﹣百度 | 无码aⅴ精品一区二区三区浪潮| 国产老熟女伦老熟妇视频| 国内揄拍国内精品少妇| 国产人妻人伦精品| 两女女百合互慰av赤裸无遮挡| 欧美激情在线播放| 免费无遮挡禁18污污网站| 最近最新中文字幕| 欧美三级午夜理伦三级| 最新国产毛2卡3卡4卡| 亚洲午夜久久久精品影院| 色偷偷88888欧美精品久久久| 在线天堂中文在线资源网| 亚洲精品永久在线观看| 亚洲色无码国产精品网站可下载| 999国内精品永久免费视频| 天堂av无码av一区二区三区|