Boiling dryer use matters needing attention: 1, before using, the rotating cylinder idling operation, check whether to turn with the shell internal standard arrow shown in the same row, electric wire 2, in part, to make the workpiece is evenly distributed in the drum, a workpiece loading amount of workpiece size, generally 1/2 less than to go for the best. 3, with the foot brake plate, must make rotary switch disposed off condition. 4, dehydration machine can no more separate line heating centrifugal drying, but not shutting down the motor alone heating drying. 5, should always check, maintenance, regular add high-quality lubricating grease into the bearing, to maintain good performance of dewatering machine. Tank mixing machine instructions and the matters needing attention 1, before the use should be a cargo transfer test, should first check trough type mixing machine all solid connection degree in the test, the integrity of the reducer lubrication oil quantity and electrical equipment, and then close the switch, the power supply, idle test. 2, idle test requirement item-by-item test. Without sound, bearing retainer abnormal high fever, reducer temperature helicopter undesirable phenomenon was found, it can be put into production. 3, in operation for scraping mixer tank wall materials, the application of bamboo tools, must not be hand, so as to avoid injury accident. 4, in the trough type mixing machine use of such as the discovery of abnormal machine vibration or send abnormal noises, should immediately stop check. 5, mixing machine load is not too large, generally by the motor load determination, heavy current with 380V motor when mixed, with no more than 6 amperes as normal, such as more than a load immediately reduce the mixing capacity. 6, the stirring paddle shaft seals should be kept clean, lest cause material blackening, metamorphism, mixing tank at both ends and leave a square hole, should be smooth, not to plug, to avoid the pressure, so that dirt into the axis, so that the groove material blackening, metamorphism. 7, management personnel must be familiar with the trough type mixing machine technical performance, internal structure, control structure using the principle of. During the period of operation shall not leave the place of work, to prevent the occurrence of the fault and the damaged parts, to ensure the safety of production as the premise. |